[1]
Saefurrochman et al. 2026. A NOVEL DESIGN OF 17.5 KV HV FEEDTHROUGH FOR ARJUNA 2.0. Ganendra: Majalah IPTEK Nuklir. 24, 1 Januari (Mar. 2026), 21–28. DOI:https://doi.org/10.17146/gnd.2021.24.1.6223.