[1]
Wardhani, V.I.S. and Santoso, B. 2018. AN ANALYSIS OF PUMP POWER CALCULATION OF CONVERTED BANDUNG TRIGA REACTOR WITH PIPE ROUTING THROUGH DELAY TANK. Jurnal Teknologi Reaktor Nuklir Tri Dasa Mega. 20, 3 (Oct. 2018), 143–150. DOI:https://doi.org/10.17146/tdm.2018.20.3.4623.