[1]
Dibyo, S. et al. 2015. ANALISIS DESAIN PROSES SISTEM PENDINGIN PADA REAKTOR RISET INOVATIF 50 MW. Jurnal Teknologi Reaktor Nuklir Tri Dasa Mega. 17, 1 (Aug. 2015), 19–30. DOI:https://doi.org/10.17146/tdm.2015.17.1.2235.