Wardhani, V. I. S., & Santoso, B. (2018). AN ANALYSIS OF PUMP POWER CALCULATION OF CONVERTED BANDUNG TRIGA REACTOR WITH PIPE ROUTING THROUGH DELAY TANK. Jurnal Teknologi Reaktor Nuklir Tri Dasa Mega, 20(3), 143–150. https://doi.org/10.17146/tdm.2018.20.3.4623