WARDHANI, Veronica Indriati Sri; SANTOSO, Budi. AN ANALYSIS OF PUMP POWER CALCULATION OF CONVERTED BANDUNG TRIGA REACTOR WITH PIPE ROUTING THROUGH DELAY TANK. Jurnal Teknologi Reaktor Nuklir Tri Dasa Mega, [S. l.], v. 20, n. 3, p. 143–150, 2018. DOI: 10.17146/tdm.2018.20.3.4623. Disponível em: https://ejournal.brin.go.id/tridam/article/view/2239. Acesso em: 6 dec. 2025.