Wardhani, Veronica Indriati Sri, and Budi Santoso. 2018. “AN ANALYSIS OF PUMP POWER CALCULATION OF CONVERTED BANDUNG TRIGA REACTOR WITH PIPE ROUTING THROUGH DELAY TANK”. Jurnal Teknologi Reaktor Nuklir Tri Dasa Mega 20 (3):143-50. https://doi.org/10.17146/tdm.2018.20.3.4623.