1.
Wardhani VIS, Santoso B. AN ANALYSIS OF PUMP POWER CALCULATION OF CONVERTED BANDUNG TRIGA REACTOR WITH PIPE ROUTING THROUGH DELAY TANK. Jurnal Teknologi Reaktor Nuklir Tri Dasa Mega [Internet]. 2018 Oct. 30 [cited 2025 Dec. 6];20(3):143-50. Available from: https://ejournal.brin.go.id/tridam/article/view/2239