OPTIMASI LUASAN PETAK TEBANG DI HUTAN TANAMAN RAWA GAMBUT BERDASARKAN PRODUKTIVITAS DAN BIAYA
Main Article Content
Abstract
As of this occasion, the management of timber harvesting at the peat-swamp plantation-forest in practice still has not yet reached the optimal tree felling plot area. Consequently, this necessitates exploring a representative model to determine meticulously such optimal plot area, thereby ensuring the forest management to proceed in a sustainable way. In relevant, the related study was carried out consecutively in May 2012 at the PT Wira Karya Sakti's concession area in Jambi; and in June 2012 at the PT Riau Andalan Pulp & Paper's concession area in Riau. For such, the necessary data were taken descriptively and purposively, which comprised the felling-plot areas (X) and the costs (Y) for skidding, maintenance, and canal erection. Further, the obtained X-Y data couples were analyzed for possible quadratic regression models. Results revealed that in Jambi the X-Y model came-up in the regression equation as Y =254.82 - 10.98 X + 0.21 X (R = 0.43 ), with the optimum felling area (X) equal to 26.69 ha and the minimum cost for skidding, maintenance, and canal erection (Y) reaching 105.32 (in Rp 1,000,000,000). Correspondingly, in Riau, the X-Y appeared as Y =299.47 - 14.85 X + 0.26 X (R = 0.59 ), with the optimum felling area (X) reaching 28.60 ha and the minimum cost (Y) as much as 87.14 (in Rp 1.000.000.000).
Article Details

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
References
Buongiornio, J & J. K. Gilles. 2003. Decision methods for forest resource management. Academic Press. Amsterdam.
Direktorat Jenderal Pengusahaan Hutan. 1993. Petunjuk Teknis Tebang Pilih Tanam Indonesia (TPTI) pada Hutan Alam Daratan. Direktorat Jenderal Pengusahaan Hutan. Departemen Kehutanan. Jakarta.
Elias. 1998. Forest Harvesting Case Study : Reduced Impact Timber Harvesting in the Tropical Natural Forest in Indonesia. FAO. Rome.
Food and Agricultural Organization. 1992. Cost control in forest harvesting and road construction FAO Forestry Paper No.99 FAO of the UN. Rome.
Muhdi. 2006 . Perencanaan hutan dalam kegiatan pemanenan kayu. Departemen Kehutanan. Fakultas Pertanian. Universitas Sumatera Utara. Medan.
Munir, S. 2008. Statistik Deskreptif (1): Regresi Linier Sederhana. Fakultas Ekonomi. Universitas Mercu Buana. Jakarta.
Parmuladi, B. 1995. Hutan Kehutanan dan Pembangunan Bidang Hutan. Penerbit Grafindo Persada. Jakarta.
Riau Andalan Pulp and Paper. 2012. Laporan Hasil Cruising/Pre Harvesting Inventory PT. Riau Andalan Pulp & Paper. Pekanbaru.
Suhartana, S. & Yuniawati. 2011. Peningkatan produktivitas pemanenan melalui teknik pemanenan kayu ramah lingkungan: Kasus di satu perusahaan hutan rawa gambut di Kalimantan Barat. Jurnal Penelitian Hasil Hutan 29 (4):369-384. Pusat Penelitian dan Pengembangan Keteknikan Kehutanan dan Pengolahan Hasil Hutan. Bogor.
Suhartana, S., Sukanda & Yuniawati. 2012. Kajian luas petak tebang optimal di hutan tanaman rawa gambut: kasus di satu perusahaan hutan di Riau. Jurnal Penelitian Hasil Hutan 30(2):114-123. Pusat Litbang Keteknikan Kehutanan dan Pengolahan Hasil Hutan. Bogor.
Suhartana, S., Yuniawati, & Dulsalam. 2013. Biaya dan produktivitas penyaradan dan pembuatan/pemeliharaan kanal di HTI rawa gambut di Riau dan Jambi. Jurnal Penelitian Hasil Hutan 31(1):36-48. Pusat Litbang Keteknikan Kehutanan dan Pengolahan Hasil Hutan. Bogor.
Wirakarya Sakti. 2012. Laporan Hasil Cruising/Pre Harvesting Inventory PT. Wirakarya Sakti. Jambi.