UNJUK KERJA TEKNIK PENYARADAN KAYU DENGAN METODE TREE LENGTH LOGGING PADA HUTAN ALAM LAHAN KERING

Main Article Content

Maman Mansyur Idris
Soenarno

Abstract

In Indonesia, logging in natural forests is generally undertaken by cutting the main trunk along the clear boles and skidding the trunk to the landing point. This paper examines skidding performance of an alternative method, i.e. tree length logging which conducted by cutting off the stem above the first branch up to minimum diameter of 20 cm, which is manifested by the productivity and skidding cost. The method was practiced in four areas of Licency Natural Forest Concessionary managed by intensive sylvicultural system. Results show that the log skidding productivity ranged from 21.127 – 23.893 m³/hour with average of 22.217m³/hour depending on skidding distance. Meanwhile, skidding cost of tree length method ranged from Rp 24,852.36 - Rp 29,318.49/m³ with average of Rp 28,628.10/m³ with skidding distance ranged from 100 m to 225 m.

Article Details

How to Cite
Maman Mansyur Idris, & Soenarno. (2015). UNJUK KERJA TEKNIK PENYARADAN KAYU DENGAN METODE TREE LENGTH LOGGING PADA HUTAN ALAM LAHAN KERING. Jurnal Penelitian Hasil Hutan, 33(2), 153–166. https://doi.org/10.20886/jphh.2015.33.2.153-166
Section
Articles

References

Abeli W.S. & Magomu W.S. (1992). Optimal road spacing for manual skidding sulkies. Jurnal of Tropical Forest Science. Vol. 6 (1): 8-15.

Adebola, B.A. (2006). Productivity and cost of cut-to-length and whole-tree Harvesting in a mixed-conifer stand. Thesis. College of Graduate Studies. University of Idaho.

Dulsalam. (2012). Pemanenan kayu ramah lingkungan. Prosiding Seminar Nasional Teknologi Mendukung Industri Hijau Kehutanan Tahun 2011. Bogor. Pusat Penelitian dan Pengembangan Hasil Hutan. Bogor.

FAO. (1992). Cost control in forest harvesting and road contruction. Rome. FAO forestry paper no 99, FAO of the UN.

Han H.S., Lee H.W. & Johnson L.R. (2004). Economic feasibility of an integrated harvesting system for small-diameter trees in southwest Idaho. Forest Prod. J. 54(2):21-27.

Mulyadi, A. (2002). Analisis produktivitas kerja dan biaya pemanenan hasil hutan di hutan rakyat. Jurnal hutan rakyat Vol IV No 1. Pusat Kajian hutan rakyat. bagian Menejemen Hutan Fahutan UGM. Bulaksumur, Yogyakarta.

Ponsse, O. (2005). The cut-to-length harvesting system. www.ponsse.com. accessed November 27, 2005.

Pulkki, R. (1999). Cut-to length, tree length or full tree length harvesting. Lakehead University faculty of forestry.

http://www.wvhighland.org/VoiceApr99/ WhTreeLog.htm. Diakses 24 Oktober 2013.

Ruslim, Y. (1996). Perencanaan pembuatan jaringan jalan hutan dan sistim pemanenan hutan tropis basah. Frontier No.18. Edisi Februari 1996.

_______, Hinchrichs A. & Ulbricht R. (1999). Panduan teknis pelaksanaan pembalakan ramah lingkungan. SFMP Document No.10b. Proyek pengembangan sistem pengelolaan hutan lestari. Kerjasama Teknik Indonesia-Jerman.

Simanullang, A.S. (2009). Analisis biaya penebangan, penyaradan, muat bongkar dan pengangkutan logs pada alat yang beroperasi di Areal IUPHHK PT Bina Balantak Utama, Distrik Pantai Barat, Kabupaten Sarmi. Skripsi. Fakultas Kehutanan. Universitas Negeri Papua. Thesis. Tidak Diterbitkan.

Most read articles by the same author(s)

1 2 > >> 

Similar Articles

<< < 8 9 10 11 12 13 14 15 > >> 

You may also start an advanced similarity search for this article.