ANALISIS KEBUTUHAN PERALATAN PEMANENAN KAYU STUDI KASUS DI PT. SURYA HUTANI JAYA, KALIMANTAN TIMUR

Main Article Content

Sona Suhartana
Yuniawati

Abstract

Proper quantity of equipments in timber harvesting should be well planned and managed to obtain efficient time and cost of production. This paper study the proper quantity of timber harvesting equipment in accord with production target. The study was conducted in 2010 at PT Surya Hutani Jaya, East Kalimantan. Data collected from the field consisted of equipment productivities, owners and operating costs, number of equipments, and production plan. The collected data were then averaged, and the effects of equipments on productivity and production cost were analyzed using multiple linear regression. Results reveal that there are excessive and shortage uses of equipments in felling to hauling activities, according to the production plan. The most efficient wood harvesting equipments composition for the correlated production consist of 21 units chainsaws for felling, 9 units excavators for skidding, 10 units loaders, 2 units excavator for unloading and 31 units trucks for hauling. The number of timber harvesting equipments has significant influences on harvesting productivity and production cost.

Article Details

How to Cite
Sona Suhartana, & Yuniawati. (2025). ANALISIS KEBUTUHAN PERALATAN PEMANENAN KAYU: STUDI KASUS DI PT. SURYA HUTANI JAYA, KALIMANTAN TIMUR. Jurnal Penelitian Hasil Hutan, 35(2), 145–153. https://doi.org/10.20886/jphh.2017.35.2.145-153
Section
Articles

References

Asikainen, A., Stampfer, K., Talbot, B., & Belbo, H. (2010). Simulation of skyline systems in Norwegian conditions. In H. Belbo (Ed.), 56. Simulation of skyline systems in Norwegian conditions (p. 101). Norwegian: Norden.

Bîrda, M. (2013). Evaluation of Winch Performance in Round Wood Harvesting. Bulletin of The Transilvania, 6(2), 1–8.

Dulsalam, & Tinambunan, D. (2006). Produktivitas dan biaya peralatan pemanenan hutan tanaman: Studi kasus di PT Musi Hutan Persada, Sumatera Selatan. Jurnal Penelitian Hasil Hutan, 24(3), 251–266.

FAO. (1999). Cost Control in Forest Harvesting and Road Construction. Rome : FAO Forestry Paper 99.

Hiesl, P., & Benjamin, J. (2013). Applicability of International Harvesting Equipment Productivity. Studies in Maine, USA: A Literature Review. Forests, 4, 898-921. Studies in Maine, USA: A Literature Review. Forests, 4, 898–921. Diakses dari http://doi.org/10.3390/f4040898

Kehutanan, D. (2003). Keputusan Menteri Kehutanan no 428/Kpts-II/2003 tentang Pedoman Perhitungan Kebutuhan Alat-Alat Berat. Jakarta. Tanggal 18 Desember 2003.

Mousavi, R., & Naghdi, R. (2013). Time consumption and productivity analysis of timber trucking using two kinds of trucks in northern Iran. Journal of Forest Science, 2013(5), 211–221.

Pecenka, R., & Hoffmann, T. (2015). Harvest technology for short rotation coppices and costs of harvest , transport and storage. Agronomy Research, 13(2), 361–371.

Popovici, R. (2013). Estimating chainsaw operating costs based on fuel, lubricants and spare parts. Bulletin of The Transilvania, 6(1).

Rankin, J. (2015). Mechanical harvesting-the future is here. Forests for Maines future. Diakses dari http:// www.forestformainesfuture.org.

Suhartana, S., & Yuniawati. (2006a). Efisiensi penggunaan chainsaw pd kegiatan penebangan: Studi kasus di PT. Surya Hutani Jaya, Kalimantan Timur. Jurnal Penelitian Hasil Hutan, 24(1), 63–76.

Suhartana, S., & Yuniawati. (2006b). Pengaruh teknik penebangan, sikap tubuh penebang dan kelerengan terhadap efisiensi pemanfaatan kayu mangium (Acacia mangium Wild). Peronema Forestry Scinece Journal, 2(2), 37–44.

Suhartana, S., & Yuniawati. (2007). Penggunaan alat pemanenan kayu yg efisien:Studi kasus di satu perusahaan hutan di Kaltim. Jurnal Wahana Foresta, 1(2), 1–12.

Suhartana, S., & Yuniawati. (2008). Penggunaan peralatan pemanenan kayu yang efisien pada perusahaan hutan tanaman di Kalimantan Selatan. Jurnal Penelitian Hasil Hutan, 26(3), 243–252.

Suhartana, S., Yuniawati, & Rahmat. (2009). Efisiensi kebutuhan peralatan pemanenan di hutan tanaman industri, di Kalimantan Barat. Jurnal Hutan Tropis Borneo, (26), 119–127.

Visser, R. (2009). Effect of piece size on felling machine productivity. Harvesting Technical Note, 2(9), 1–5.

Most read articles by the same author(s)

1 2 > >> 

Similar Articles

<< < 6 7 8 9 10 11 12 13 14 15 > >> 

You may also start an advanced similarity search for this article.